Somerset Levels floods is the name usually given to the long and damaging flooding of the Somerset Levels and Moors in south west England during the winter of 2013-14, when farmland and villages were under water for weeks. It is a popular developed country case study for Topic 1: In this guide I explain the background, the physical and human causes, the impacts and the short-term and long-term responses, including dredging of the Rivers Parrett and Tone and the 20-year Flood Action Plan.

Table of Contents
What were the Somerset Levels floods?
The Somerset Levels floods happened between December 2013 and February 2014. After weeks of almost non-stop rain, the rivers that drain the Levels could not carry the water away to the sea. Around 6,900 hectares of farmland were flooded, villages such as Muchelney and Thorney were cut off for weeks, and Somerset County Council declared a major incident on 24 January 2014.
The flooding was not sudden like a flash flood. It was slow, deep and very long-lasting. Some fields stayed under water for more than two months. This is what made the Somerset Levels floods so unusual and such a useful case study: the impacts came from the duration of the flood as much as its depth.
Key terms you need to know
- Levels and Moors: low, flat land in Somerset, drained over centuries by ditches (called rhynes), rivers and pumps.
- Dredging: digging out silt and mud from a river bed to make the channel deeper so it can carry more water.
- Tide-locking: when high tides stop river water from draining into the sea, so it backs up inland.
- Saturated soil: soil whose pore spaces are full of water, so new rain cannot soak in and runs off instead.
- Pumping station: a site that pumps water out of low land and into a river or the sea.
- Flood Action Plan: the long-term plan, published in March 2014, to reduce flood risk on the Levels over 20 years.
Somerset Levels floods: 8 essential facts
The eight sections below follow the order you should use in an exam answer: background, causes, impacts and responses.
1. Background: where are the Somerset Levels?
The Somerset Levels and Moors cover around 650 square kilometres of flat, low-lying land between the Mendip Hills, the Quantock Hills and the Blackdown Hills. Much of it is only a few metres above sea level, and parts lie below the level of the highest spring tides in the Bristol Channel. The land is made of clay and peat, which hold a lot of water.
Several rivers cross the Levels, including the Parrett, the Tone, the Brue and the Axe. The Tone joins the Parrett at Burrowbridge, and the Parrett reaches the sea near Bridgwater. People have drained this land since the Middle Ages, and today a network of ditches, embankments, sluices and pumping stations keeps most of it dry enough for dairy farming. The area is also important for wildlife, especially wetland birds.
2. What happened in winter 2013-14
A long series of Atlantic storms crossed the UK from December 2013. The Met Office later confirmed that the winter of 2013-14 was the wettest in a series for England and Wales going back to 1766, and January 2014 was the wettest January in southern England since records began in 1910.
The rivers rose and spilled onto the moors in late December and early January. Water kept building up through January and February. By early February, villages were islands, roads were closed and the town of Bridgwater was under threat. The Somerset Levels floods only began to drain properly in March 2014, helped by drier weather and extra pumps.
3. Physical causes of the Somerset Levels floods
- Extreme rainfall: month after month of above-average rain, from repeated low pressure systems, fell on the river catchments.
- Saturated ground: the clay and peat soils were already full of water by the end of December, so almost every extra millimetre of rain became surface runoff.
- Flat, low land: there is very little gradient, so water drains slowly and spreads out over a wide area once it leaves the channel.
- High tides: the Bristol Channel has one of the largest tidal ranges in the world. At high tide the sluices near the coast must shut to keep sea water out, so river water could only drain for a few hours each day. Storm surges made this worse.
4. Human causes of the Somerset Levels floods
- Lack of dredging: many local people and farmers argued that the Parrett and Tone had not been properly dredged for about 20 years. Silt had built up on the river bed, reducing the amount of water the channel could carry.
- Land use upstream: large areas of maize are grown in the upper catchment. Maize fields are often bare in winter and compacted by heavy machinery, so rain runs off quickly and carries soil into the rivers.
- Drainage of the land: centuries of drainage have dried and shrunk the peat, so the land surface has sunk lower over time.
- Building on the floodplain: homes, roads and businesses have been built in areas at risk, which increases the cost when floods happen.
You can read more about how silt builds up in a channel in my guide to river deposition, and about the general causes of flooding in this guide to floods.
5. Social impacts
Nobody died in the Somerset Levels floods, but daily life was badly disrupted. Villages such as Muchelney, Thorney and parts of Moorland were cut off by flood water, Muchelney for around a month. Residents had to use boats to reach shops, schools and doctors. Some families were evacuated and many homes in Moorland and other villages had water inside. Estimates of the number of flooded homes vary, but hundreds of households were affected directly or indirectly.
The stress of living with flooding for weeks took a heavy toll on mental health. A later report for the Somerset Rivers Authority estimated the social and mental health cost at up to 4.8 million pounds. School journeys took much longer, and some pupils could not get to school at all.
6. Economic impacts
An independent report by Parsons Brinckerhoff, commissioned by Somerset County Council, estimated that the Somerset Levels floods cost the county up to 147.5 million pounds. The main costs are shown in the table below (all figures are the highest estimates).
| Sector | Estimated cost (up to) | Why |
|---|---|---|
| Rail transport | 21.3 million pounds | Lines closed and services disrupted |
| Residential property | 20 million pounds | Damage to homes and contents, temporary housing |
| Emergency response | 19.3 million pounds | Environment Agency, emergency services and councils |
| Road closures | 15 million pounds | More than 80 roads closed, long detours |
| Agriculture | 6.9 million pounds | Lost grazing, feed, moving livestock, reseeding fields |
| Business premises | 4.1 million pounds | Damage and lost trade |
| Social and mental health | 4.8 million pounds | Stress, illness and disruption |
Farmers were hit especially hard. Many had to move cattle to higher farms or sell them, and buy in feed because their own grass and stored hay were ruined. The same report found that about half of Somerset businesses were severely affected, mostly because of road closures. You can read the summary on the Somerset Rivers Authority website.
7. Environmental impacts
- Flood water was polluted with sewage, oil, fuel and farm chemicals, which spread across fields and into homes.
- Grass was under water for so long that the soil ran out of oxygen. Grass died, and many fields had to be ploughed and reseeded.
- Earthworms and other soil animals drowned, reducing food for wading birds such as lapwing and snipe in the following spring.
- Large amounts of silt and debris were deposited on farmland and roads.
- On the positive side, wetland nature reserves on the Levels are adapted to winter flooding and some bird species benefited from the extra standing water.
8. Responses to the Somerset Levels floods
Responses are usually split into short-term (immediate) and long-term. It helps to learn three or four examples of each.
Short-term responses
- Somerset County Council declared a major incident on 24 January 2014.
- Royal Marines from 40 Commando helped with sandbagging and evacuations, and volunteers ran boat services to cut-off villages.
- The Environment Agency used dozens of pumps to move water off the moors. In February 2014 a team from the Netherlands brought eight high-capacity pumps to Dunball, near Bridgwater, which together could move about 56,000 cubic metres of water per hour.
- Thousands of sandbags were prepared to protect Bridgwater, and the government provided emergency funding to councils and farmers.
Long-term responses
- The 20-year Flood Action Plan: published on 6 March 2014 and estimated to cost around 100 million pounds over 20 years.
- Dredging: work to dredge about 8 km of the Rivers Parrett and Tone began on 31 March 2014 and was completed later that year. The silt was used to strengthen flood banks.
- Raised roads: roads such as the one into Muchelney were raised so that villages are not cut off as easily.
- Better pumping and channels: pumping stations were upgraded and channels such as the River Sowy and King’s Sedgemoor Drain were improved to carry more water.
- Somerset Rivers Authority: set up in 2015 to coordinate flood work, partly funded by local council tax.
- Bridgwater Tidal Barrier: construction began in 2023 on a barrier across the River Parrett to stop tidal surges, with completion planned for later in the 2020s.
- Upstream land management: farmers are encouraged to plant cover crops, reduce soil compaction and plant trees to slow runoff.
Evaluating the management of the Somerset Levels floods
| Strategy | Strengths | Weaknesses |
|---|---|---|
| Dredging | Increases channel capacity, popular with local people, water drains away faster after a flood | Silt returns, so it must be repeated; it cannot cope with rainfall as extreme as 2013-14 on its own |
| Pumping | Moves large volumes of water quickly | Expensive to run and limited by tide-locking |
| Raised roads | Keeps villages connected, so daily life continues | Does not stop homes or fields flooding |
| Tidal barrier | Protects Bridgwater from tidal surges and sea level rise | Very expensive; cost estimates rose sharply during planning |
| Upstream land management | Cheap, tackles the cause, benefits wildlife and soils | Slow to take effect, relies on farmers agreeing |
Overall, the response mixed hard engineering such as dredging and the barrier with soft engineering such as land management. Most experts agree that dredging alone would not have prevented the Somerset Levels floods, because the main cause was the sheer volume of rain. A combined, catchment-wide plan gives the best chance of reducing future flood risk, especially as climate change brings wetter winters.
Linking the Somerset Levels floods to fieldwork
You could use the Somerset Levels floods as a starting point for a river or flood risk investigation. For example, you could compare channel cross-sections on a dredged and an undredged stretch of river, survey land use in a drainage basin to identify areas of fast runoff, or download river level data from a storm and draw a hydrograph to measure the lag time.
Somerset Levels floods: frequently asked questions
When did the Somerset Levels floods happen?
The main Somerset Levels floods lasted from late December 2013 to March 2014, with the worst conditions in late January and February 2014. The area had also flooded in late 2012, which meant that the ground and the people were already struggling.
Did dredging cause the Somerset Levels floods?
Not on its own. A lack of dredging reduced river capacity and made the floods last longer, but the main cause was record rainfall on saturated ground, made worse by high tides. Dredging is now one part of a wider plan.
How many people died in the Somerset Levels floods?
No deaths were directly linked to the Somerset Levels floods. The slow rise of the water and good warnings gave people time to leave, which is typical of floods in developed countries.
What is the Bridgwater Tidal Barrier?
It is a barrier being built across the River Parrett near Bridgwater. It will close during tidal surges to stop sea water pushing up the river, reducing flood risk for thousands of homes and businesses.
Somerset Levels floods: key takeaways
- The Somerset Levels floods hit south west England between December 2013 and March 2014, flooding about 6,900 hectares of farmland.
- Physical causes: record winter rainfall, saturated clay and peat soils, very flat land and tide-locking in the Bristol Channel.
- Human causes: silted rivers that had not been dredged for about 20 years, maize farming upstream and drainage that lowered the land.
- Impacts: villages cut off for weeks, polluted water, ruined grassland and costs of up to 147.5 million pounds to Somerset.
- Responses: Royal Marines, Dutch pumps, the 20-year Flood Action Plan, dredging 8 km of the Parrett and Tone, raised roads and the Bridgwater Tidal Barrier.
To conclude
The Somerset Levels floods show that even in a wealthy country with good warnings, a long period of extreme rain on low, flat land can cause months of disruption. Nobody died, but the economic and social costs were high, and the event led to a new long-term approach that combines dredging, pumping, a tidal barrier and better land management. Learn a few precise facts from each section and you will have a strong developed country case study.